Project in Fremont, CA, March–October 2026
Water under a hardwood floor, dried and rebuilt
The floor looked fine from above. The meter said otherwise. We took the wet and moldy floor out, dried what was underneath, and laid a new hardwood floor, inlay border included.
-
First visit
March 13, 2026
We read moisture under the floor before touching anything. Under the boards, the meter went to the top of its scale.
-
Containment, tear-out and mold
March 26, 2026
Plastic walls closed off the work area from the rest of the house. The wet hardwood and the subfloor under it came out, down to the slab. There was mold under the floor; it came out with the wet wood.
-
Drying
March 26–30, 2026
Air movers ran over the open floor, and we kept taking readings on the slab before anything was closed up.
-
Rebuild
August 21, 2026
New hardwood went in with the inlay border laid again. The counter next to the floor got a new countertop and backsplash, with the cabinets wrapped while the work finished.
-
Restored
September 2026
Floor finished, inlay border back in place, kitchen open again.